ROAD · PRIORITY
Emergency Vehicle Signal Priority
Coordinate signals along emergency response routes.
PRODUCT OVERVIEW
Coordinate signals along emergency response routes.
Connect emergency vehicle locations and response routes with intersection signal data to request signal priority and check operating status. A centralized, on-site or hybrid control configuration is designed to suit site conditions.
Discuss products & configurationsCAPABILITIES
Key capabilities and scope.
- 01
Response route integration
Identify target intersections and routes based on vehicle location and destination
- 02
Intersection control integration
Review center connectivity and integration with existing controllers
- 03
Operations & impact analysis
Manage priority request and processing histories and response-route operating information
CONFIGURATION
Configuration & integration.
- Offering type & stage
- System · Site & center integration · Implementation solution
- Input information
- Emergency vehicle terminals, vehicle locations, response routes and target intersection information
- Center functions
- Route/intersection mapping · Vehicle tracking · Priority determination · Statistics & monitoring
- Centralized control
- Integration through existing traffic signal control systems and traffic signal controllers
- On-site control
- Integration of priority signal control boards (PPCB) with on-site signal controllers at the required intersections
- Implementation scope
- Vehicle terminals, roadside base stations, priority signal servers, operating screens and integration with existing equipment are finalized for each site
Source: 2026 Company Profile, pages 5 & 7
Detailed models, installation conditions, integration scope and acceptance criteria are finalized through project review and approved specifications.
STANDARDS & INSPECTION
Applicable standards & inspection evidence.
Passed the KoROAD functional inspection under Korean National Police Agency standard specifications
Manufacturer: CREWAVEENG · Issue date: 2025.09.04
- CW7402
- Boryeong City project inspection
Inspection certificate 25-17-121 - CW7401
- OBE certificate-issuance inspection
Inspection certificate 25-18-122
The conformity result is limited to the inspected models and configurations. Installation and integration conditions are reviewed separately for each site.
Reference for wide-area centralized control
2025.09.25 · R01.1
This is a reference for wide-area centralized control; it does not identify the standards applied to the functional inspections of the models above.
FIELD DEPLOYMENTS
Emergency vehicle signal priority across sites nationwide.
Explore deployment regions and configurations connecting vehicles, intersections and centers.
BUILT AROUND YOUR SITE
Define the configuration together
for your emergency response environment.
Begin by reviewing implementation conditions for connecting vehicles, intersections and existing centers for local governments, fire services and industrial facilities.
- 01
Site & scale
Target vehicles · Intersection count · Response routes · Existing installation conditions
- 02
Existing equipment
Signal controller types · Center integration · On-site communication networks
- 03
Configuration & testing
Terminals & interface devices · Required testing & certificate scope · Site integration
- 04
Implementation & handover
Budget review · Implementation schedule · Operating procedures · Support scope
Can we inquire while still reviewing the budget?
Share your vehicle and intersection scale, existing equipment and planned implementation timing. We can guide you through the configuration and site checks needed for review.
Can we keep using our existing signal controllers?
It depends on controller specifications, types and site integration conditions. We review existing equipment information to determine the scope of replacements, additional devices and testing needed.
Start by sharing your vehicle and intersection scale.
Discuss emergency vehicle signal priority implementationLET’S MOVE FORWARD
Make the next mobility solution
a reality, together.
From site conditions and product needs to implementation, operations and technical collaboration.
